(Summary description)1.1 The steel structure anti-corrosion spray protection shall be constructed by a professional construction team that has been trained and qualified. The safety technology and labor protection requirements during construction shall be implemented in accordance with the relevant national regulations.

Operation procedures and requirements of epoxy antirust anticorrosive primer and fluorocarbon topcoat

(Summary description)1.1 The steel structure anti-corrosion spray protection shall be constructed by a professional construction team that has been trained and qualified. The safety technology and labor protection requirements during construction shall be implemented in accordance with the relevant national regulations.

  • Categories:Company News
  • Author:
  • Origin:
  • Time of issue:2018-09-14 09:18
  • Views:
Information
Article 1. Construction technology of steel structure and anti-corrosion pipeline
 
1.1 The steel structure anti-corrosion spray protection shall be constructed by a professional construction team that has been trained and qualified. The safety technology and labor protection requirements during construction shall be implemented in accordance with the relevant national regulations.
 
1.2 When the steel structure or pipeline is installed in place, the hanger rods, horse tracks, pipe racks and other related components connected to it are installed and qualified, and the anti-corrosion paint and fluorocarbon topcoat can only be constructed.
 
1.3 Before construction, the surface of the steel structure or pipeline should be derusted, and anti-rust treatment should be determined according to the requirements of use. Rust removal and anti-rust treatment shall comply with the relevant provisions in the current "Code for Construction and Acceptance of Steel Structure Engineering".
 
1.4 The debris on the surface of the steel structure should be cleaned, and the gaps at the connection should be filled with anticorrosive paint or other anticorrosive materials before construction. Construction anti-corrosion coatings should be carried out before indoor decoration and under conditions that will not be damaged by subsequent projects. During construction, parts and other objects that do not require anti-corrosion protection should be shielded and protected, and the newly applied coating should be protected from dirty liquid pollution and mechanical impact.
 
1.5 During the construction process and before the coating is dried and cured, the temperature should be maintained at 5 to 38 ° C, the relative humidity should not be greater than 90%, and the air should be circulated. When the wind speed is greater than 5m / s, or when there is condensation on the surface of the rainy day, it is not suitable for operation. Quality requirements 
 
1.6 The two-component paint should be prepared on site according to the instructions; the two-component paint should also be fully stirred. After spraying or brushing, there should be no flow or falling.
 
1.7 Professional construction to ensure construction quality, paint film thickness and paint film effect.
 
1.8 All the supporting products provided by our company are used.
 
1.9 Mix the paint thoroughly before construction, mix it with the curing agent and thinner in proportion, and mix well.
 
Both can be constructed.
 
Article 2. Construction process of primer coating:
 
2.1 When the rust removal and anti-rust treatment on the surface of the steel substrate meets the requirements, dust and other debris can be removed before construction.
 
2.2 Construction ratio of primer coating: [paint 5 kg: curing agent 1 kg: thinner 1 kg] The ratio is about right, the specific ratio should be determined according to the coating thickness and construction design requirements, 2.3 The bottom layer is generally painted 1 to 2 The thickness of each spraying must reach 60-80μm or more. It must be dried or cured in the previous pass and then sprayed again. The spray protection method, spraying number and coating thickness should be determined according to the construction design requirements.
 
2.4 Make sure the coating is completely closed when spraying,
 
2.5 The bottom layer is generally painted twice and should cover the bottom layer completely. The total amount of paint is 0.2 ~ 0.4kg / ㎡.
 
2.6 The operator should carry a thickness gauge to check the thickness of the coating and ensure that the coating reaches the thickness specified in the design.
 
2.7 When the design requires the coating surface to be flat and smooth, the last coating should be smoothed to ensure that the outer surface is even and smooth.
 
 
 
Article 3. Construction process of topcoat coating:
 
Article 4: Primer brush 1-2 times, top paint brush once, total thickness is about 180 microns, the dosage is about 0.2-0.4 kg / square twice, the surface is about 0.1-0.3 kg / square
 
3.1 Construction ratio of topcoat coating: [paint 5 kg: curing agent 1 kg: thinner 1 kg] The ratio is good, the specific ratio should be determined according to the coating thickness and construction design requirements.
 
3.2 When the thickness of the bottom layer meets the design requirements and is basically dry, the surface layer can be constructed.
 
3.3 The surface layer is usually painted once, and it should cover the bottom layer completely. The total amount of paint is 0.1 ~ 0.3kg / ㎡.
 
3.4 The surface layer should be uniform in color and smooth.
 
3.5 The spraying or brushing construction should be completed in multiple passes. The thickness of each spraying or brushing should be 60-80 μm. It must be basically dried or cured in the previous pass and then after the spray. The spraying protection method, spraying number and coating thickness shall be determined according to the requirements of construction design.
 
3.6 The total thickness of the bottom surface of the coating is about 180μm, and the total amount of coating is: 0.3-0.5kg / ㎡.
 
3.7 During the construction process, the operator should use a thickness gauge to detect the thickness of the coating until the thickness specified by the design is met before spraying can be stopped. After spraying the coating, to ensure even and smooth.
 
3.7 When one of the following conditions occurs in the anti-corrosion coating, it should be re-sprayed:
 
3.7.1 When the coating is dry and hard to cure, if the bonding is not strong or powdered, empty, or falling off.
 
3.7.2 When the coating at the joints and corners of the steel structure or pipeline has obvious depressions.
 
3.7.3 When the coating surface has floating slurry or crack width greater than 1.0mm.
 
3.7.4 When the coating thickness is less than 85% of the design thickness, or the coating thickness is greater than 85% of the design thickness.
 
Article 4. Finished product protection 4.1 Steel structures or pipelines should be temporarily fenced and isolated after painting to prevent trample and damage to the coating. 4.2 After painting, if there is strong wind or rain within 4h, the steel components should be covered to prevent dust and moisture from adhering to the coating and affecting the adhesion of the coating. 4.3 When the painted steel structural parts or pipelines need to be transported, care should be taken to prevent bumps, dragging on the ground, and coating damage.
 
Article 5: Quality problems that should be paid attention to 5.1 The operating temperature of the coating should be between 5 and 38 ℃. When the weather temperature is lower than 5 ℃, the corresponding low-temperature coating material should be selected for application. 5.2 When the temperature is higher than 40 ℃, the coating operation should be stopped. When the temperature of the component exceeds 40 ° C, the application of paint on the surface of the steel will produce bubbles, which reduces the adhesion of the paint film. 5.3 When the air humidity is greater than 85%, or there is condensation on the surface of the component, the coating operation should not be carried out. 5.4 Before making steel members, the hidden parts of the members and the parts where the structural interlayer is difficult to remove rust should be removed in advance and painted in advance.
 
 Article 6. Inspection and acceptance of coatings: 6.1 During and after surface coating construction, the painted workpieces shall be protected to prevent flying dust and other debris. 6.2 The processing inspection after painting should be the same color of the coating, bright and bright color, no wrinkle,
 
Not a pimple. 6.3 Determination of the thickness of the paint film, the thickness of the paint film is measured by a contact-type paint film thickness gauge. The paint film thickness gauge generally measures the thickness of 3 points, and the average value is taken.
 
Article 7 Quality standards: 7.1 The descaling of the steel surface before painting shall comply with the design requirements and the relevant provisions of the current national standards: the surface of the steel after chemical derusting shall reveal the metal color. The surface of the processed steel should be free of welding slag, welding scars, dust, oil stains, water and burrs. Inspection method: check with a shovel and compare with the pictures stipulated in the current national standard "Rust Corrosion Level and Derusting Level of Steel Surface before Coating". 7.2 It shall not be applied by mistake or missed. The coating shall be free from peeling and rust. 7.3 Inspection method: Observe and inspect. 7.3.1 The basic items should meet the following requirements: 7.3.2 Appearance quality of painting works: Qualified: The painting should be uniform, without obvious wrinkles, bubbles, and good adhesion. Excellent: The application should be uniform, the color should be consistent, without wrinkle skin, dripping and air bubbles, the adhesion should be good, and the color separation line should be clear and tidy.
 
7.4 Inspection 7.4.1 The quality of repainting of components:
 
Qualified: The paint film for repainting should be complete. Excellent: Make up the brush in layers according to the coating process, the paint film is complete and the adhesion is good.
 
Number of inspections: random inspection of 10% according to the number of components of each category, but no less than 3 pieces. Inspection method: observation and inspection. 7.4.2 The allowable deviation items and inspection methods for the thickness of the dry paint film of the coating project shall comply with the provisions in Table 5-26. The thickness value and allowable deviation value of the dry paint film shall comply with the provisions of "Code for Construction and Acceptance of Steel Structure Engineering". Number of inspections: random inspection of 10% according to the number of similar components, but no less than 3 pieces, each measuring 5 points, the value of each point is the average value of the thickness of the dry paint film of 3 measuring points about 50mm apart Allowable deviation items and inspection methods of dry coating film thickness Table 5-26

Scan the QR code to read on your phone

Explanation of Enquiry

Contact information

Basic information
Method of contact and occupation
Company information
验证码

Jiangmen City Tu Feng Chemical Co., Ltd.

Tel:0750-3988350

Miss Wang:13822383835

Add:JiuyunIndustrialZone, Long'anvillage,durian Town, Pengjjiang district, Jiangmen City, Guangdong, China