Welcome to Jiangmen Tufeng Chemical Co., Ltd.
Oil based industrial paint
-
DB-1A Acrylic Metal Baking Paint Series
-
DB-2B Polyurethane Two-Component Paint Series
-
DB-3C Acrylic Plastic Paint Series
-
DB-4D Alkyd Antirust Paint Series
-
DB-7G Epoxy Anti-rust And Anti-corrosion Primer
-
DB-7G Epoxy Anti-Rust And Anti-Corrosion Paint Series
-
DB-7G High-temperature Anticorrosive Coating Is resistant To 300 Degrees
-
DB-8H Fluorocarbon Paint Series
-
DB-9K Rubber Paint Series
-
DB-11M High Temperature Paint Series
-
DB-12N Floor Paint Series
-
DB-16T Thermal Insulation Coating Series
-
DB-17 Polyurea Waterproof Coating Series
-
DB-18V Oil-Based Exterior Wall Paint Series
-
Polyamide Side Lacquer
-
Epoxy Cloud Iron Intermediate Paint
-
Epoxy Rich In Zinc Primer
-
Chlorinated Rubber Anti-corrosion Coating Material
-
Highly Chlorinated Polyethylene Anti-corrosion Coating
-
Water-resistant Coatings
Epoxy Ceramic Flooring Paint I. Product Introduction Epoxy ceramic flooring paint is a coating made by combining epoxy resin and ceramic materials. It is a high-performance, decorative, practical, environmentally friendly, and aesthetically pleasing and durable flooring paint that emerged in Europe and America in the late 20th century and has been widely used. This flooring paint uses an integral polymer surface layer, the main components of which are epoxy resin and curing agent. Product Features: First, it has excellent corrosion resistance and can resist the erosion of chemical media. This is mainly due to the chemical resistance of epoxy resin and its good bonding strength, high mechanical strength, good toughness and other comprehensive properties. Secondly, epoxy ceramic flooring paint has excellent decorative properties, its appearance color is rich and colorful, the gloss is good, and it can provide a beautiful and generous decorative effect for the ground. In addition, it is also practical, with excellent physical and mechanical properties and excellent wear resistance and impact resistance, so it can be used in a variety of occasions for ground decoration. At the same time, it is also environmentally friendly, with no solvent volatile emissions, no heavy metal elements, and meets green environmental protection requirements. III. Scope of Application Widely used in hospital floors, food factories, workshop floors, underground parking lot floors and other places that need to maintain high hygiene and aesthetics. It can effectively improve the working environment of factory workshops, meet environmental protection requirements, reduce dust and ground moisture, and improve production efficiency and work comfort. IV. Technical Indicators: Film: various colors; smooth and flat film Adhesion (1mm grid) grade: ≤1 Viscosity (25°C): 400±200CPS Impact resistance KgNaN: ≥70 Drying time h: surface dry ≤4h, solid dry ≤24h Alkali resistance, 30%NaOH, 48h: good Pencil hardness: ≥2H Acid resistance, 30%H2SO4; 48h: good Abrasion resistance, 500g, 1000 revolutions, g: ≤0.2 Ratio: main agent: curing agent = 4:1 Bending test: ≤1mm Water resistance 30 days: no blistering V. Construction Process and Steps: Surface Treatment: 1. Clean and inspect the substrate: After cleaning or vacuuming the substrate, check the substrate for cracks and voids. If any, deep cutting and cleaning are required, and then filled with epoxy resin mortar. Cleaning should not be done by rough hammering to avoid loosening the underlying layer. First coat: Epoxy sealing primer construction: Primer ratio [1 kg epoxy sealing primer A: 1 kg epoxy sealing primer B], before construction, first mix the primer A and primer B separately, then mix according to the ratio, stir thoroughly for about 3 minutes, then construction can be carried out, needs to be used up within 60 minutes, after the primer surface (4 to 5 hours) is dry, the topcoat can be applied. Second coat: Epoxy ceramic flooring topcoat construction: Topcoat ratio [4 kg epoxy ceramic flooring topcoat: 1 kg epoxy topcoat curing agent], before construction, first stir the paint thoroughly for 2-3 minutes, then mix with the curing agent according to the ratio, stir thoroughly for 3-5 minutes, then construction can be carried out. Needs to be used up within 50 minutes. This product can be used for about 30 minutes at above 25℃. Please determine the amount of each batch according to the actual temperature and construction progress. The mixed materials must be used up at one time, and the remaining A/B components must be sealed and stored. On-site cleaning and maintenance, floor maintenance After the topcoat is completed, remove the relevant construction materials and tools from the site, People are not allowed to enter and walk for at least 72 hours. And no sand and other garbage items can be brought in. The paint film usually takes 7 days to fully cure. During this period, other construction, handling, installation and other construction should be avoided. VI. Storage and Safety Protection: The product should be stored in a cool and ventilated place, protected from direct sunlight, and kept away from fire and heat. Keep the construction process dry and clean, and strictly prohibit contact with water, acid, alcohol, alkali, etc.; after mixing the paint, the curing agent packaging bucket must be tightly covered to prevent gelation. Operators should wear safety masks and gloves to avoid contact with skin or eyes. If accidental contact occurs, rinse with clean water.