Technical Instruction Manual for Metallic Baking Paint
2018-09-25
Paint Application Instructions Company Name: Jiangmen City Tufeng Chemical Co., Ltd. Paint: Metal Baking Paint Substrate: Hardware Parts Coating Conditions and Process 1. Clean workpiece: Wipe the phosphated workpiece with S08 cleaning solution before spraying to remove mold release agents and grease from the surface, keeping it dust-free and sweat-free. 2. Paint Spraying: 2.1 Paint Dilution: Dilute the paint with thinner to 15 seconds (NK-4 cup) [Diluent ratio: Paint: Thinner = 1:0.8-1 (weight ratio)]. 2.2 Paint Filtration: After dilution, filter the paint with a mesh screen no less than 250 mesh.
View DetailsTechnical instructions for the construction of metal baking paint
2018-09-25
Paint Construction Instructions Company Name: Jiangmen Tufeng Chemical Co., Ltd. Paint: Metal Baking Paint Workpiece Substrate: Hardware Coating Conditions and Process 1. Cleaning the workpiece: Wipe the phosphated workpiece with S08 face wash before spraying, Surface release agent and grease, keep the surface dust-free and sweat-free. 2. Spray paint: 2.1 Paint dilution: Dilute the paint with thinner for 15 seconds (NK-4 cups) [thinner ratio: oil: thinner = 1:0.8-1 (weight ratio)] 2.2 Paint filter: put the open After the paint is diluted, filter it with a filter screen of no less than 250 meshes,
View DetailsIntroduction materials for high-temperature thermal insulation coating for boilers
2018-09-21
I. Introduction: A boiler is an energy conversion device. The energy input to the boiler includes chemical energy from fuel and electrical energy. The boiler outputs steam, boiler high-temperature water, or organic heat carriers with a certain amount of thermal energy. The temperature generated by the boiler is above 1000℃, with a high concentration of oxidizing atmosphere and severe corrosion, requiring long material life. Experts from Jiangmen Tufeng Chemical Boiler High-Temperature Coating propose that for such boiler operating conditions, boiler high-temperature coatings must be applied as essential materials for boiler operation, boiler material protection, and energy saving. Boiler high-temperature coating includes heat insulation coating: DB-11M1088 boiler high-temperature heat insulation.
View DetailsBrief introduction of high temperature thermal insulation coatings for boilers
2018-09-21
1. Introduction: Boiler is a kind of energy conversion equipment. The energy input to the boiler includes chemical energy and electrical energy in the fuel, and the boiler outputs steam with certain thermal energy, high temperature boiler water or organic heat carrier. The temperature generated by the boiler should be above 1000 ℃, the oxidizing atmosphere is thick, the corrosion is serious, and the material is required to have a long service life. Jiangmen Tufeng Chemical Boiler High-Temperature Coating Expert proposed that the boiler must be painted with high-temperature coating as a necessary material for boiler operation or boiler material protection and energy saving in such working conditions. Thermal insulation coating in boiler high temperature coating: DB-11M1088 boiler high temperature thermal insulation
View DetailsEpoxy resin self-leveling floor paint construction scheme process
2018-09-15
Epoxy Floor Paint Construction Plan I. Construction Process Flow 1.0mm thick epoxy floor paint construction process: Base surface grinding, cleaning, crack repair → Apply epoxy sealing primer 1 coat → Apply epoxy middle coat 1 coat → Apply epoxy floor topcoat 1 coat, requiring primer, middle, and topcoats to be applied once a day. II. Construction Methods: 1. Base Surface Treatment: A. Clean and inspect the base: After sweeping or vacuuming the base surface, check if there are cracks or hollows in the base. If so, deep cut and clean, then fill with epoxy resin mortar. Do not knock violently during cleaning to avoid loosening the surrounding base layer. 2. Primer Proportion: Primer Component A: Primer Component B
View DetailsEpoxy resin flat coating floor paint construction plan process
2018-09-15
Epoxy floor paint construction plan 1. Construction process 1.0mm thick epoxy floor paint construction process: base surface grinding, cleaning, crack repair → painting epoxy sealing primer 1 time → painting epoxy intermediate paint 1 time → Apply the epoxy floor topcoat once, and require the bottom, middle and topcoats, and brush once a day. Second, the construction method: 1. Base surface treatment: A. Cleaning and inspection of the substrate: After cleaning or vacuuming the substrate, inspect the substrate for cracks and empty shells. If there is, it must be deeply cut and cleaned and filled with epoxy resin mortar. Do not beat violently during cleaning to avoid knocking loose edges. upper base. 2. Primer ratio: Primer A component: Primer B
View Details2018-09-14
Article 1, Steel Structure and Anti-corrosion Pipeline Construction Process 1.1 Anti-corrosion spray protection for steel structures should be carried out by a trained and qualified professional construction team. Safety technical and labor protection requirements during construction should be implemented in accordance with relevant national current regulations. 1.2 Only after the steel structure or pipeline is in place, and related components such as hangers, walkways, pipe racks, and other connected components are installed and accepted, can the anti-corrosion coating and fluorocarbon topcoat be applied. 1.3 Before construction, the surface of the steel structure or pipeline should be derusted, and rust prevention treatment should be determined according to usage requirements. Derusting and rust prevention treatment should comply with the relevant provisions in the current "Code for Construction and Acceptance of Steel Structures".
View Details2018-09-14
Article 1. Construction technology of steel structure and anti-corrosion pipeline 1.1 The anti-corrosion spraying protection of steel structure should be constructed by a trained and qualified professional construction team. The requirements for safety technology and labor protection during construction shall be implemented in accordance with the current relevant regulations of the state. 1.2 When the steel structure or pipeline is installed in place, the suspenders, horse tracks, pipe frames and other related components connected to it are installed, and the acceptance is qualified, and the anti-corrosion coating and fluorocarbon topcoat can be applied. 1.3 Before construction, the surface of the steel structure or pipeline should be derusted, and the anti-rust treatment should be determined according to the use requirements. The rust removal and anti-rust treatment shall comply with the relevant regulations in the current "Code for Construction and Acceptance of Steel Structure Engineering"
View Details